After about two days of refinement, DMC and the customer’s in-house programmer were able to get the cycle time to within four seconds, allowing for a small margin for error.ĭMC also configured ABB World Zones to ensure that the robot was clear for the system to move. The cycle time was required to be within four seconds for the full operation. Upon arriving at the customer facility, DMC downloaded the programming and configurations to the robots, updated the revolution counters and points, and was performing manual dry cycling on the first robot by the start of the second day. The basic points, logic, and control programming were near completion before arriving for on-site commissioning. The PLC then receives back boolean data as well as integer statuses, alarms, and other data. The robots can also be commanded to move to specific positions from the HMI panel, such as a maintenance position and a safe position. We then instructed the robots to perform operations with simple Boolean commands. DMC first integrated with the Allen Bradley PLC using Anybus protocol to communicate digital and analog signals for the operation.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |